Grading in Upstate South Carolina

Laser-checked building pads, yard leveling, and drainage grading — dirt work measured to the inch, not eyeballed.

What the job really is

Graded to a number, not a feeling

Drainage grading has a measurable standard: ground should fall away from your foundation about a quarter inch per foot — a 2% slope — for the first six to ten feet. We grade to that number and verify it by instrument, because “looks flat” is how yards end up holding water. Upstate red clay raises the stakes: our Cecil-series subsoil is nearly impermeable once compacted, so the surface has to move the water — the ground won’t absorb it.

The other half of quality grading is what’s underneath. Fill dumped in one thick layer settles as it wets and dries — cracking the slab or patio above it a year or three later. We place fill in thin lifts and compact every one with dedicated equipment. And we won’t work red clay wet: pushing mud to hit a schedule smears the clay into a crust that causes drainage problems for good.

Signs you need help now

What we do

Every job, done right.

How it works

  1. 1

    Shoot the grades

    Laser on site, existing falls measured — we find where the water actually goes before we move dirt.

  2. 2

    Cut, fill & compact

    Organics stripped, fill placed in thin lifts, each lift compacted — no loose fill, no future settling.

  3. 3

    Shape the drainage

    Falls away from the foundation at the 2% standard; swales carry water to a proper outlet.

  4. 4

    Verify & stabilize

    Grades re-checked by instrument; bare clay stabilized so it doesn’t wash before grass takes hold.

Jobs we’re asked about most

Yard drainage fixes

Standing water and soggy spots are slope problems. The ground should fall away from your foundation about a quarter-inch per foot, and low spots need a swale route out. We reshape the yard so water leaves on its own.

Erosion & washout repair

Bare Piedmont clay gullies fast once water gets organized. We rebuild washed-out slopes and ditches, re-route the water that caused the damage, and stabilize the ground with seed and matting so the repair holds through the next storm.

Lawn grading & new-lawn prep

After construction or clearing, we finish-grade the yard, respread the stockpiled topsoil, and leave a smooth, positive-draining surface ready for seed or sod — no buried debris, no low spots that pond.

Free site walk — we shoot the grades before we quote the work

Book your free inspection

Frequently asked questions

How do I know if my yard needs regrading?

Standing water after rain, soggy spots that never dry, or water running toward your foundation are the classic signs. Grading reshapes the slope so water moves away from the house and off the usable parts of your yard.

What is laser grading?

We set a rotary laser level on the site and check grades against it as we work, instead of eyeballing the slope. It’s how building pads come out flat and drainage swales actually carry water where they should.

Do you grade building pads for new construction?

Yes — pads are cut, filled, and compacted in lifts with a roller, then checked with the laser. A pad that isn’t compacted properly settles later, and everything on top settles with it.

Can grading fix the drainage problems in my yard?

Usually, yes. Most residential drainage problems are slope problems — water with nowhere to go. Regrading, swales, and crowning solve what French drains often just hide.

How should the ground slope away from my house?

The rule of thumb: the ground should fall away from the foundation about a quarter-inch per foot for the first six to ten feet. If your yard holds water against the house, regrading restores that fall.

Ready to open up your land?

Free written estimate. See the price before any work begins.